In this project, which we developed for the screening and washing of river gravel, we established a production line with a capacity of 200–350 Tons/Hour. We designed the feeding, pre-screening, washing and classification, and dewatering processes in an integrated manner to produce a total of five different product fractions.
Feeding Bunker we separated the material arriving from source using a two-tier pre-screen, directing one fraction directly to the storage area and the material to be further processed to the vibrating wash screen via a conveyor. We ensured that the material was washed while being screened by the washing nozzles located on each level of the screen, and that the separated aggregates were transported to the relevant areas via stockpile conveyors.
We integrated a hydrocyclone-based dewatering system into the production line to process the finest material. With this section, where excess water is removed from the fine product to prepare it for storage, we have completed our plant solution, which spans from preliminary screening to final product storage.